A tenant has reported mould: what to do in the first 10 days
A landlord's step-by-step plan for the first 10 working days after a damp and mould report, aligned to Awaab's Law timescales and good practice.
A landlord with four rented homes gets an email from a tenant: mould in the main bedroom, a young child in the home, and photos attached.
What to do, step by step
- Day 0: acknowledge in writing
Thank the tenant, confirm the date you became aware, and give a date for an inspection. Log it.
- Day 0 to 1: triage for risk
Young children, older people, pregnancy and respiratory conditions raise priority. Anything that could cause imminent harm, such as a large leak near electrics, is an emergency.
- Within 10 working days: investigate the cause
Not just the surface. Readings, ventilation, heating, leaks, the outside of the building. Social landlords must do this within 10 working days under Awaab's Law, and the same is proposed for private renting.
- Within 3 working days of the inspection: tell the tenant in writing
What was found, what you will do and when.
- Make safe within 5 working days, then fix the cause
Treat the mould and do immediate measures, then the lasting fix: fan, insulation, gutter, leak.
- Re-inspect and keep the record
Check it has worked after a few weeks. A dated record of a prompt, proper response is your strongest protection against complaints and disrepair claims.
Mistakes to avoid
- Repainting over mould without investigating
- Blaming the tenant in the first reply
- No written record of dates
What usually happens: A fast, documented response protects tenants and protects you. Most disputes come from delay and poor records, not from the mould itself.
Next steps
Example scenario based on common situations, not a real client case. General information, not legal advice. For your situation, contact Shelter, Citizens Advice or a solicitor.