INDEPENDENTAn independent inspection company. Not a government service. We never sell damp treatments or repairs.
Medium priority · Tenant

The leak was fixed but the mould came back

A leak has been repaired but damp and mould are back. Why walls need drying out, what may still be wet, and what to ask for.

The situation

After a leaking bath waste was repaired, the landlord's contractor repainted the wall the next day. Three weeks later the damp patch and mould are back.

What to do, step by step

  1. Ask whether the wall was dried

    Plaster and brick hold water for weeks or months after a leak. Painting straight away traps it.

  2. Ask for moisture readings

    Readings show whether the wall is still wet or whether the leak has returned.

  3. Check the repair

    A second leak, or a seal that failed again, is common. Look under the bath panel if you can do so safely.

  4. Report in writing

    Explain the timeline and ask for the wall to be dried and checked before any redecoration.

Mistakes to avoid

  • Redecorating before the wall is dry

What usually happens: Dry, then decorate. Readings over a few weeks confirm when it is ready.

Next steps

Example scenario based on common situations, not a real client case. General information, not legal advice. For your situation, contact Shelter, Citizens Advice or a solicitor.

Similar situations

Find the cause. Fix it once.

Fixed prices from £345. Visit within 5 working days. Evidence-led report within 48 hours. No treatments sold.

Call 0203 811 8331 or WhatsApp 07760 505030

Get a priceCallTenant help